Monday, August 15, 2016

Local Construction Update

SPOKANE COUNTY
Seven Mile Bridge & Seven Mile Road- Work is underway on the bridge deck. A marked
detour is in place. The speed limit has is reduced to 25 mph.

Hawthorne Road West (Waikiki to US395)- Road reconstruction, installation of stormwater drainage swales, tree planting, irrigation components, curb installation, signal improvement, bike lane installation and striping. The road is completely closed until August 30.

Hawthorne Road East (US395 to US2)- Road reconstruction, stormwater upgrades, curbing, signal, bike lane installation and roadway striping. The road is closed to traffic.

Argonne Road (Spokane River to Wellesley)- Road reconstruction and stormwater system retrofit. Argonne is reduced to one lane in each direction. Expect long delays. Right turns only at Maringo (No cross traffic movements).

SPOKANE VALLEY
32nd from Dishman-Mica to Pines- Expect rolling closures to all but local traffic eastward from Dishman-Mica to Pines around the clock Monday, August 15 through Wednesday, August 17. Detours are posted.
Flora between Mission and Boone- Closed to all but local traffic through Thursday, August 26 for utility and access work. Traffic is redirected via Boone, Arc and Mission.

McDonald from Sprague to 16th- Closed to all but local traffic through Friday, September 2 for resurfacing and other improvements. Intersections at 4th and 8th will be closed with signs redirecting sidewalk and street traffic.
McDonald northbound from Mission to Sprague- Reduced to one lane for about 3 weeks beginning Monday, August 15.

Mission between Lilly and Park -
Closed through August 26th with signs redirecting traffic via Thierman, Broadway and Park.  

Park between Nora and Mission - Expect narrowed lanes through the end of August. 

Sullivan Road Bridge Replacement-Traffic is reduced to one lane northbound and two lanes southbound. Turns from Indiana onto northbound Sullivan are reduced to one lane. Left turns from Sullivan onto eastbound Indiana will be closed for the next 3 to 4 weeks. Southbound traffic headed for Indiana east of Sullivan will be redirected at Euclid via Barker and Mission.

WSDOT
North Spokane corridor/Wellesley & Freya Roundabout- Utility company preliminary work prior to contractor construction. Possible shoulder lane restrictions.

US 2-Division Street/Curb and Sidewalk- Northbound Division Street is reduced to one or two lanes for curb and sidewalk improvements.  Drivers may experience congestion and delays.

I-90/Westbound Freya Off-Ramp- Crews are constructing a new westbound Freya Street off-ramp approximately ¼ mile to the east of the current ramp. Second Avenue is closed between Havana Street and Freya Street with a marked detour in place. 

US 395-Division Street/Hawthorne Rd. Intersection- Intersection improvements and installation of a new traffic signal system. Non-intersection work east and west on Hawthorne Road is a Spokane County project. Hawthorne Road is closed east and west of Division.  Division Street turn lanes are closed.  All mainline lanes of Division are open.

No comments:


About SRTC

SRTC is the federally designated Metropolitan Planning Organization (MPO) for Spokane County. Urbanized areas with populations exceeding 50,000 people are required to have an MPO. SRTC was formed to address the county's transportation planning needs. It provides coordination in planning between the public, cities, small towns, the county, the state, transit providers, and tribes.

SRTC offers services including transportation monitoring, transportation modeling, census information analysis, travel demand forecasting, historical traffic count analysis, geographic information systems, and trip generation rates.