Monday, November 7, 2011

I-90 Project Wrapped Up For Winter

Crews are suspending work for the season on the I-90/Latah Creek Bridge project. Minor items, including striping, will be underway this week as the roadway is prepared for winter. All lanes and ramps will be open for winter. The speed limit will be returned to 60 miles per hour. Work will resume in the spring to grind the pavement to remove studded tire ruts, repair cracked pavement, and resurface bridges.

No comments:


About SRTC

SRTC is the federally designated Metropolitan Planning Organization (MPO) for Spokane County. Urbanized areas with populations exceeding 50,000 people are required to have an MPO. SRTC was formed to address the county's transportation planning needs. It provides coordination in planning between the public, cities, small towns, the county, the state, transit providers, and tribes.

SRTC offers services including transportation monitoring, transportation modeling, census information analysis, travel demand forecasting, historical traffic count analysis, geographic information systems, and trip generation rates.